Humberto Verdejo – Planner / Scheduler Engineer Katy, Texas 77494, USA. Email: hverdejo07@hotmail.com, Cell: +1 713 447 6174 SUMMARY Mexican
native, residing in USA, graduated as Industrial Engineer in Electricity with
16+ years of high caliber work background in Project Controls; with strong
experience using planning tools software to perform Planning/Scheduling and
Cost Controls as Expert Matter and Supervisory positions on Offshore &
Subsea Construction projects for multicultural and cross-functional
organizations w/Int’l assignments in Middle & Far East regions. Mostly
involved with major EPCI projects, including TAR, Subsea PL, T&I
scopes, Subsea Equip Manufactured & In-Yard Fabrication Marine Platforms
and Associated Equipment and Controls Installation, Regulatory Barge
Re-Certification works, and Building new Barges on Shipyard. Abided by
Company’s Policies & Work Procedures, Team player & Self-Initiated,
and looking to contribute on an “anticipated basis” to get the most
realistic Project’s Forecasts. EDUCATION Bachelor Degree: Industrial Engineering in Electricity. College:INSTITUTO TECNOLOGICO DE VERACRUZ, Veracruz –
Mexico.June/1993 SKILLS
/ EXPERTISE Software: Primavera
user expert incl. P3, P5 & P6 versions. Have used P6
in the last 6 years. Also know how to use at advanced level Microsoft
Project, Excel, PowerPoint, Word, and Milestone Pro. Role’s related: Project Planning
& Scheduling, Change Order Tracking, Forecast Analysis, What-If
Scenarios, Critical Path & Deviation Analysis, Schedule Baseline Set up,
Contractors Schedule Review, Master Project Schedule Integration, Project
Progress Tracking (EVM), Progress S curves and Job Reporting, Resource
Loading and Manpower Histogram Analysis, Key Milestone & KPI tracking,
Project Risk Assessment, Cost Control, Cash Flow Analysis, Accounting &
Financing Feedback, Benchmarking, and PMP Philosophy. TRAINING 1.
Microsoft Office Advanced
Excel 2003 - @ Systems Microsoft CertifiedMay/2005 @ Sistemas Microsoft Certified “Technical Education
Center” Ciudad del Carmen, Camp. Mexico 2.
Planning & Tracking
Projects w/Primavera Project Planner (P3) for Windows7/18/2005 Systec – Primavera Authorized Representative, Ciudad del
Carmen, Camp. Mexico 3.
Primavera 5.0 Project
Management Basic Course – T1029/28/2006 TEPCO – at Global Industries in Ciudad del Carmen, Camp.
Mexico 4.
Project Management
Professional (PMP) Training – Houston, TX, USA.Dec/2009 By accredited PMI’s Rep while working for Global
Industries Offshore, LLC in Houston, TX. PROFESSIONAL
BACKGROUND T-REX Engineering + Construction -
Houston, TX.NOV 5, 2014 – Jun 5, 2015 Project Services Manager (Corporate Position). Managing and overseeing all Project Services activities/deliverables
including Planning & Scheduling, Cost Control, Document Control,
Procurement, Warehouse, and Estimating for Engineering, Yard Fabrication, and
EPCI projects. ·
Monitored the project execution of the EPCI project
“Refurbish of Two Decks for Shallow Water Marine Platforms (Delfin Sur and
Piedra Redonda) and Fabrication of the respective two Jackets to be installed
offshore in Peru for Pacific Rubiales Energy (75MM USD). ·
Supervised and mentored Sr. Planner and entry level
project controls specialist on the Planning/Scheduling best practices and
Primavera tool application for the fabrication yard projects. ·
Supervised different Yard Fabrication RFQ’s from Clients
for the fabrication of Structural Skids, Platform Grillage and Sea Fastening,
Subsea Equipment (PLEMS, PLETS, Manifolds, Jumpers, and Risers), Pressure
Vessels. ·
Monitored/tracked the status on various yard fabrication
projects (Process Skid, Jumpers, Grillage & Sea Fastening Elements,
PLET’s & PLEMS) by using the EV technique and kept updated the S progress
curves. ·
Started the Implementation of the Receiving Material
Control System, Tool Room Inventory, Approved Vendor List, and Issuing Requisitions
by using a networked database. ·
Implemented the Integrated Yard Fabrication Schedule
with the FCST Man Power requirements for upper management to plan ahead about
staffing and des-staffing concerns. ·
Actively participated to align the Project Services Team
with the QA/QC and HSE Policies put in place. ·
Reviewed and updated the work procedures for the Project
Services Team by interacting with the respective Department Manager and
provided the required training to comply with the internal QA System. Foster Wheeler Upstream -
Houston, TX.MAR 12, 2014 – Oct 20, 2014 Planning/Scheduling Supervisor (PMC role). Early Production PERLA Project: Offshore Export
Pipeline, Flow line and FOC Engineering, Procurement, Transportation,
Offshore Installation, Testing and Pre-commissioning. A shallow water green
field development in the Gulf of Venezuela by CARDON IV - JV (ENI, REPSOL and
PDVSA / 160B USD Project Value approx.) ·
Supervise the Planning/Scheduling team in the
Fabrication yard at Tampico – Mexico for the 3 Marine Platforms being
fabricated. ·
Set up the Schedule's WBS and keep updated the
Integrated Project Schedule by liaising with stakeholders ·
Keep updated the Platform Fabrication Schedule as per
Field Engineer by using MS Project. ·
Incorporate the subcontractor schedule on the integrated
schedule to track their performance vs. baseline. ·
Fab yard on site visits to verify Platforms &
Jackets Fabrication progress and discuss alternatives with contractors to
improve performance ·
Responsible for job reporting, incl. S curves, look
ahead schedules, critical path, Level 1, 2 and 3 schedules. ·
Keep updated the Progress Table per Platform and for the
overall project by using the EV technique. ·
Keep updated the Man Power Histogram for the yard
fabrication scope. ·
Issue all the job reporting of the project. ·
Track the LLI fabrication equipment and their delivery
dates on site for installation. ·
Develop detail installation schedule to show the barge utilization
on offshore works. ·
Added new detailed activities into the overall Platform
Fabrication to better track the current Critical Path. ·
Review & Commented the Bi-weekly & Monthly
Project Reports from the Platform Fabrication Contractor. ·
Produce the Exhibit 3 Report (Critical Material &
Equipment delivery dates) for financing team. ·
Issue specific schedule layouts for specific stakeholder
request. ·
Monitor scope deviations abided by the Change Management
procedure. ·
Interact with Cost Engineer to verify cost allocation to
WBS and forecast completion dates. ·
Liaise with Accounting, and Finance group to allocate
costs properly per WBS and Forecast Project's Costs ·
Interact with Cost Engineer to verify cost allocation to
WBS and forecast completion dates. BP (Gulf of Mexico Region) -
Houston, TX.Feb 20, 2012 – Oct 31, 2013 Planner/Scheduler Engineer (BP’s representing) Atlantis Project: A new Upstream Development, Subsea
& Deep Water Project (55B USD Project Value approx.) ·
Set up the Master Control Schedule (MCS) according
w/BP’s Policies & Procedures using Primavera-6. ·
Met w/Area Scheduling Mgr. & Stakeholders to review
the offshore work preps to comply w/MAXIMO criteria. ·
Updated the Schedule Basis and Assumptions report
according w/the PEP and set up the baseline schedule. ·
Cross functionally liaise w/stakeholders to update the
current MCS in a bi-weekly basis including AFE’s Government, Engineering,
SCM, Major Eq. Manufacture, Yard Fab., US Regulation (work-permit approval),
Wells’ Drilling & Completion, Offshore Inst., Commissioning, and
Operation’s Handover. ·
Set up project’s WBS, tracked project’s progress using
EV technique, progress “S” curve, and communicated the stakeholders’
performance w/specific reports/layouts highlighting deviations from PT w/explanations. ·
Developed detailed schedules for specific work packages
as needed and linked them to the MCS. ·
Updated & tracked the Project’s Risk Register to be
review with PM, PE and Executives in a monthly basis. ·
Developed “What If” scenarios as required during the
projects’ life cycle. ·
Worked together with the Cost Engineer to align the
costs allocation according to the WBS codes. ·
Provided inputs to PSL to produce the Project’s Monthly
Report for Upper Management and Executives. ·
Attended monthly meetings w/Functional Managers and PGM
to review the current critical path and completion dates of key milestones,
and to detect opportunities/conflicts among projects. ·
Performed project’s reporting for PMT & Executives
incl. Detailed, Summary, and look ahead schedules. ·
Produced the Risk Analysis Schedule Model to re-assess
the project’s risks limits and opportunities. ·
Abided by Change Management Procedure to track, and
evaluate the MCS’s impact due to Scope Changes. ·
Provided inputs to the Benchmark team as needed. ·
Held monthly meetings w/Accounting & Financing to
review the Expenses and current Forecast Cost. Technip / Global Industries
Offshore, LLC - Houston, TXAug
2009 – Feb 17, 2012 Sr. Planning & Cost Controls Engineer (Various projects ranging 5
to 25 MM USD) ·
Provided Project Control role according w/Project
Control Policies & Procedures using Primavera-6. ·
Set up & keep updated the Barge’s Integrated
Dry-dock, Maintenance and Upgrade Schedule. ·
Produce the 18 months look ahead Dry-dock Schedule and
issue it to PMT and incumbent Business Unit VP. ·
Developed detailed DD, MA and CP Schedule and Budget per
barge to define and freeze the scope to back up the PEP and get AFE approval
from project’s Sponsor. ·
Set up WBS and loaded cost/resources to track progress
using the EV technique. ·
Liaise with stakeholders to update the schedule and
updated the progress “S” curves. ·
Held kick off meetings, on-site visits to monitor and
conciliate the physical progress for the weekly reports. ·
Liaise w/PMT to confirm FCST dates, deviations analysis
report and scope changes conciliation w/vendors. ·
Met w/Accounting and financing to ensure accurate cost
codes, and supported benchmark as needed. ·
Integrated the subcontractors schedule into the Detailed
Project Schedule to track their performance. ·
Updated to Operation team w/the current DD, MA and CAPEX
Schedule to plan the barge utilization. ·
Issued and conciliated the weekly updated Project Cost
Status Report with PM and Stakeholders. ·
Updated the WW-Integrated Marine Schedule and provided
scheduling support to proposal group. ·
Provided feedback to the Fleet Operation Manager to
update the Work Procedures. Global Industries Offshore,
LLC (West Africa BU) - Houston, TX.April 2007 -
Aug 2009 Sr. Planning & Cost Controls Engineer Temporarily Assignation to the Middle East Business Unit
(Al-Khobar, Saudi Arabia). ·
Provided Project Control according with the Project
Controls Policies and Procedures using Primavera-6. ·
Set up the Project’s baseline schedule w/WBS codes and
kept it updated during the project’s life. ·
Analyzed the critical path, the key milestones
completions dates, and issued the schedule analysis report. ·
Linked to the Project’s Schedule the Major Eq.
manufacture & Fab-yard schedules. ·
Set up and issued the Marine Productivity Report (MPR)
to track the barge productivity based on the DJR and re-assess the ETC value
for the remaining offshore work and discussed it w/PMT and Projects Director. ·
Prepared Project’s Cash Flow for the Project Cost Status
Report (PCSR) to evaluate the Project’s Health. ·
Developed detailed work schedules on Fab-yard, Topside,
Subsea Inst. and NDT as needed. ·
Developed “What If” scenarios, and produced “S” curves
to track progress using the EV technique. ·
Performed the project’s reporting requirements for the
PMT, and the client. ·
Held bi-weekly meetings w/Accounting & Financing to
conciliate expenses and allocation on the WBSs. ·
Supported Benchmarking team and provided
Planning/Scheduling support to Proposals team as needed. ·
Actively involved to manage scope change and analyze
impact on the Project’s Schedule and PCSR report. ·
Prepared the Project’s Review Report pack (Project’s
Schedules and PCSR) for monthly project reviews. ·
Kept updated the Project’s Risk Register, provided the
Model Schedule for Project Risk Analysis as needed. ·
Mentored to Junior Cost Control Specialist to
update/issue the PCSR for revenue projects under execution. ·
Mentored to Junior Planner/Scheduler Engineer to update
Project’s Schedules and the Worldwide IMS. ·
Provided feedback to the Worldwide Project Controls
Director regarding work procedures. All above performed during the execution of the
following Subsea & Platform Topside construction projects: 1. 2 Pipelines
Project for PERENCO SEEG in Gabon: 8"x108 km &
10"x 98km Pipelines, Pipe Transportation, Subsea Xing’s, Risers
Installation, Pig Traps Installation, and Pre-commissioning works (52 MM
USD) 2. VAALCO -
EBOURY FACILITY Project in Gabon: Platform Transportation
& Installation, 8" Rigid PL Installation, Riser Installation, Subsea
tie-ins and PL Pre-commissioning. (75 MM USD) 3. BANZALA
Project for CABGOC – Additional Scope – Transport & Install 2 Rigid
PLs 5km each (22 MM USD). 4. BERRI WATER
INJECTION AND QATIF CRUDE OFFSHORE PIPELINES PROJECT - Berri & Qatif
Project for SAUDI ARAMCO in Al-Khobar, Saudi Arabia: 2 Rigid
Shore pulls through HDDs-16" & 30", 2 Rigid Trunk PLs:
16"x0.3 km & 30"x20.8km, 15 Lateral Rigid PLs of 12"x14km
& 16"x3.1km, Pipe Transp., Subsea tie ins, Risers Inst., Subsea
Xing’s, PL Dredging, Onshore works (2 HDDs) and PL Pre-commissioning
works. (250 MM USD) Also provided Project Control for CAPEX Projects:
Build the New Construction Barges G1200 & G1201, at Keppel Singmarine
Shipyard, in Singapore. (500 MM USD project value) Global Offshore Mexico -
Ciudad del Carmen, MexicoNOV 2003 - APRIL 2007 Project Controls CoordinatorClient: PEMEX ·
Supervised two on shore Project Control Engineers
(Planner/Scheduler and Cost Control) and two other offshore based
Planners/Schedulers for the Subsea and Platforms Topside construction
projects, and abided by the Project Control Policies & Procedures using
Primavera-5 & 6. ·
Tracked the Project’s Risk & Opportunities Register,
and held weekly project control meetings w/PMT to review the project’s
schedule, cost status, revenue, risks & opportunities, and billing
collection. ·
Provided the monthly Project’s Review Report pack:
Project’s Schedules and Project Cost Status Report (PCSR) for the monthly
project review meetings with PM and Executives. ·
Highly involved w/the scope change management process
and liaise w/Client’s Representative (PEMEX Supervision) to provide back-up
documents and impact analysis per extra-work claim. ·
Offshore visits to supervise & re-direct
Planner/Scheduler Engineers roles on reporting related issues. ·
Supported to PCM in Internal / External audits, and
provided support to Benchmarking team as needed. ·
Provided feedback to the Worldwide Project Control Director
regarding Project Control work procedures. ·
Reviewed the Project Controls deliverables from
Planner/Scheduler and Cost Control Engineers related w/the project execution
status on the following projects: 1. 8" PL
Project: 8"x12.1km Rigid PL, Pipe Trans, 8" Side tap
Inst, Risers Inst., SS Xing’s, Topside works and PL
Pre-commissioning (25 MM USD) 2. Engineering,
Procurement and Construction (EPC-77): 20"x19.5km Trunk Rigid
PL, 2 Lateral Rigid PLs of 20"x5.17km, 2 Lateral PLs of
12"x6.63km, 1 Lateral PL of 8"x3.028km, 6 SS side taps (12"
& 20"), Pipe Trans, Risers Inst, Goose necks Inst, SS Valves,
SS Xing’s Inst, PL Dredging, Pig Traps Inst & Pre-Comm. (126 MM
USD) 3. Ku-D
Package Project: 2 Rigid PLs: 12"x1.3km & 24"x2.2km, Pipe
Transportation, Risers Inst., Subsea Xing’s Inst., Subsea Valves
Inst., Pig Traps Inst., and PL Pre-commissioning (80 MM USD) 4. Ku-G
Package & PL-47 Project: 5 Rigid PLs -24"x15.4km and
30"x19km, Pipe Transportation, Seabed Rock Dumping, PLEM Fab. &
Inst., Risers Inst., Hot-tap Inst., Pig Traps Inst., and PL Pre-commissioning
(250 MM USD) DINSA (Dragados Group) -
Ciudad del Carmen, MexicoJUNE 16, 2001 – NOV 18, 2003 Planner EngineerClient: PEMEX IPC-60 Project: Eng., Proc., Fabrication & Construction to upgrade
Akal-G/GR marine platforms (185 MM USD) ·
Accountable with Project Planning/Scheduling role as per
Policies and Work procedures using Primavera-3. ·
Set up the project’s base line schedule with WBS codes.
Set up progress “S” curves using the EV technique and performed project’s
reporting during the project’s life cycle. ·
Liaised w/stakeholder to review progress and inputs for
the schedule, critical path and schedule deviation analysis, forecast
completion dates of major/key milestones, developed “What-if” scenarios
during the project’s life cycle as needed, and set up detailed schedules for
specific work packages. Integrated the Fabrication Yard Schedule into the MCS
to manage its floatation time. ·
Performed project’s reporting needs. Issued Histograms
& Curves to track the Man Power for topside works and provided
recommendations. Liaised w/Accounting & Financing to review Expenses
& Forecast Costs. ·
Incorporated project’s scope changes to the MCS to
analyze their impacts to the critical path. Prepare, issue and conciliate the
Contract’s Schedule due to scope changes attributable to Client, re-baseline
the project schedule and “S” curves due to change orders approved by the
Client. SERPROCO – Protexa Group -
Ciudad del Carmen, Mexico AUG 1998 –
JUNE 2001 Project Controls ChiefClient: PEMEX, EPC-02 Project: Eng., Proc., Fab and Const. to
upgrade the Akal-J Marine Platf. Complex and Satellite Platforms at the
CANTAREL field in the Campeche's Bahia (280 MM USD) ·
Managed two Planner/Scheduler Engineers and a Jr.
Project’s Analyst to provide Project Control for the EPC-02 Project as per
the Company’s Project Control Policies and Procedures, using Primavera-3. ·
Liaise w/managers to commit w/project scope, work
duration, sequence, priority, risks, opportunities, and perform detailed look
ahead plans. Facilitated the PMT’s weekly review meetings to conciliate
progress, get further detailed schedules, confirm project’s scope, review work’s
priorities and forecast the completion dates for Engineering, Procurement,
Yard Fab, Offshore Inst., Comm., and As-built during project’s life cycle. ·
Met w/Expediting team to track delivery dates for major
and critical equipment. ·
Offshore and Fab yards visits to verify physical
progress and detect/fix issues w/the project’s reporting. ·
Led the 3 months TAR Schedule for the Inst., Hook Up,
Commission, and Startup of two turbo pumps and one Oil & Gas tank
separator and other auxiliary equipment in Akal-NP & Akal-NM platforms.
Updated the current TAR schedule and provided project’s status to PMT and
Client’s Representative in a daily basis. ·
Kept updated the Project’s Risk & Opportunities
Register, provided support to proposal teams. ·
Prepare/issued the project review package for the
monthly project review meeting w/Client’s Rep. ·
Prepare/updated the Project’s staffing plan and reviewed
it with Functional Managers. ·
Led the Schedule Impact Analysis due to faults
attributable to Client as part of the Schedule Scope Change Management put in
place and provided feedback to Accounting/Financing department. ·
Verify Project Controls Department compliance w/the work
procedures during the project’s life cycle. Attended QA
audits/recommendations as needed, and fed back to the Corporate Project
Controls Director. Comision Federal de
Electricidad (CFE), MexicoAUG 1996 – aug 1998 Planner EngineerLaguna Verde -
Nuclear Power Station – Veracruz, Mexico. ·
Performed Planning Eng. role according w/Project Control
Procedures, using Finest Hour software. ·
Set up the Electric Baseline Schedule and linked it to
the MCS for any of the Reactor’s Operation Conditions: Refueling, Planned
shut down, and Station’s Shut-Off for both Units. Including Corrective and
Preventative open Work Orders, Modification’s Packages, and Engineering’s
Plant Inspections. ·
Upload work activities, assign logic, and loaded
resources to determine the project’s man power profile. ·
Developed links between the Electrical Discipline
Schedule and the Operation’s Major Milestones to ensure that the electrical
scope in being driven all times by the station’s operational condition. ·
Set up activity codes as required to sort project’s
activities as needed. ·
Update the current schedule twice a day based on the
physical progress and stakeholder’s updates. ·
Issued the project’s reporting during the project’s life
cycle including the Schedule and Critical Path Analysis, progress “S” curves,
Man Power Histograms, and specific look ahead schedules. ·
Project close out support, and provided feedback to
benchmarking as needed. Page 1 of 5 Curriculum Vitae: Humberto VerdejoDate: Dec 14,
2015 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
Spanish |
Fluent |
|
|
|